當(dāng)前位置: 首頁 > 新聞資訊>公司新聞安裝鐵藝護欄應(yīng)該注意的哪些問題

安裝鐵藝護欄應(yīng)該注意的哪些問題

來源:http://www.hsmjh.com 日期:2024-07-04 發(fā)布人: 瀏覽次數(shù):1

一、預(yù)埋件設(shè)計標(biāo)高、位置、數(shù)量須符合設(shè)計及安裝要求,并經(jīng)防腐防銹處理。埋件不符合要求時,應(yīng)及時采取有效措施,增補埋件。這一點特別重要,大家也都知道預(yù)埋鐵應(yīng)該最開始就要做好的工序。

1、 The design elevation, position, and quantity of embedded parts must meet the design and installation requirements, and undergo anti-corrosion and rust prevention treatment. When the embedded parts do not meet the requirements, effective measures should be taken in a timely manner to supplement the embedded parts. This is particularly important, as we all know that pre embedding iron should be done from the beginning.

二、安裝鐵藝護欄立桿的部位時,基層混凝土不得有酥松現(xiàn)象,并且安裝標(biāo)高應(yīng)符合設(shè)計要求,凹凸不平處必須剔除或修補平整,過凹處及基層蜂窩麻面嚴(yán)重處,不得用水泥砂漿修補,應(yīng)用高強混凝土進行修補,并待有一定強度后,方可進行鐵藝護欄的安裝。

2、 When installing the upright pole of the wrought iron guardrail, the base concrete should not have any looseness, and the installation elevation should meet the design requirements. Uneven and uneven areas must be removed or repaired flat. Over concave areas and areas with severe honeycomb and rough surfaces on the base should not be repaired with cement mortar. High strength concrete should be used for repair, and the installation of the wrought iron guardrail can only be carried out after a certain strength is achieved.

誠信不銹鋼鐵藝加工廠再次提醒您:一定要按規(guī)程安裝,才能保證我們的安全,不合格的安裝鐵藝護欄,會存在很多隱患,大家一定要防止。因為生命才是最重要的。

Integrity Stainless Steel and Iron Processing Factory reminds you once again: it is necessary to install according to regulations to ensure our safety. Installing iron guardrails that are not qualified will pose many hidden dangers, and everyone must prevent them. Because life is the most important thing.

下面我給大家總結(jié)以下鐵藝護欄安裝時所需要注意的幾點具體細節(jié)要求:

Below, I will summarize the specific details that need to be paid attention to when installing wrought iron guardrails:

一、鐵藝護欄到達施工現(xiàn)場后按圖紙上所規(guī)定的位置及尺寸準(zhǔn)確安裝就位,確定好標(biāo)高及垂直平整度。應(yīng)按照甲方要求與圖紙設(shè)計要求進行定位,確保達到設(shè)計要求與驗收規(guī)范。

1、 After arriving at the construction site, the wrought iron guardrail shall be accurately installed in place according to the position and size specified on the drawings, and the elevation and vertical flatness shall be determined. The positioning should be carried out according to the requirements of Party A and the design requirements of the drawings to ensure that the design requirements and acceptance specifications are met.

二、預(yù)埋件安裝根據(jù)圖紙設(shè)計要求和施工現(xiàn)場的實際情況準(zhǔn)確無誤的定位,避免造成不在一條平行線上。

2、 The installation of embedded parts should be accurately and precisely positioned according to the design requirements of the drawings and the actual situation of the construction site, to avoid not being on a parallel line.

三、鐵藝護欄所提供的標(biāo)準(zhǔn)線抄水平定位安裝,預(yù)埋間距根據(jù)樓梯踏步數(shù)量及圖紙設(shè)計要求,安裝定位。

3、 The standard line provided by the wrought iron guardrail is horizontally positioned for installation, and the embedded spacing is determined based on the number of stair steps and the design requirements of the drawings.

20230121061258535.jpg

四、安裝偏差必須符合國家規(guī)定和設(shè)計要求,達到驗收標(biāo)準(zhǔn)。

4、 The installation deviation must comply with national regulations and design requirements, and meet the acceptance standards.

五、預(yù)埋件、鐵藝欄桿安裝必須牢固,安裝偏差根據(jù)國家規(guī)定和設(shè)計要求:扶手直線度<3mm,垂直度<3mm,欄桿間距誤差<3mm,對角線誤差<3mm,預(yù)埋件垂直誤差<3mm,水平誤差<3mm。

5、 The installation of embedded parts and wrought iron railings must be firm, and the installation deviation should comply with national regulations and design requirements: the straightness of the handrail should be less than 3mm, the verticality should be less than 3mm, the spacing error between railings should be less than 3mm, the diagonal error should be less than 3mm, the vertical error of embedded parts should be less than 3mm, and the horizontal error should be less than 3mm.

六、預(yù)埋件安裝定位準(zhǔn)確無誤經(jīng)驗收后刷兩道防銹漆,再進行鐵藝護欄安裝。

6、 After the installation and positioning of the embedded parts are accurate and verified, two coats of anti rust paint will be applied before installing the wrought iron guardrail.

七、鐵藝護欄安裝完成后,接部位打磨光滑,刷兩道防銹漆,經(jīng)驗收后再做表面一致處理。

7、 After the installation of the wrought iron guardrail is completed, the joint should be polished smooth and coated with two layers of anti rust paint. After acceptance, the surface should be treated uniformly.

八、鐵藝護欄安裝運輸過程中,為防止陽臺欄桿的擦傷損壞,應(yīng)做包裝防護。

8、 During the installation and transportation of wrought iron guardrails, packaging protection should be provided to prevent scratches and damage to balcony railings.

夜夜躁狠狠躁2021| 欧美成人看片黄A免费看| 97精产国品一二三产区| 老师办公室被吃奶好爽在线观看 | 国产精品久久久久久无码专区| 亚洲精品久久无码老熟妇| 久久夜色精品国产欧美乱| 国内大量揄拍情侣在线视频99| 免费sm羞辱调教视频网站| 玩弄放荡人妻少妇系列视频| 苍井空办公室33分钟| 无码AⅤ精品一区二区三区| 97人伦影院a级毛片| 放荡娇妻张开腿任人玩h| 亚洲av无码乱码国产精品久久| 大学生第一次破女处a片| 金瓶梅1-5电影观看在线| 强制高潮18xxxxhd日韩| a片试看120分钟做受图片| 无码少妇一区二区三区| 欧美三级在线播放| 久久精品麻豆日日躁夜夜躁妓女| 我被六个男人躁到早上小说| 又爽又黄无遮挡高潮视频网站| 伊人思思久99久女女精品视频| 好男人www免费高清视频在线观看| 不说就继续这样弄你| 国产在线精品成人一区二区三区| 女人与公拘交酡全过程| 永久黄网站色视频免费直播| 中文无码热在线视频| 精品久久久久久综合日本| 国产50部艳色禁片无码| 我帮妺妺洗澡忍不住c了她| 菠萝蜜视频网站| a片在线免费观看| 男人的好看免费观看在线视频| 3d全彩无码啪啪本子全彩 | 亚洲熟妇AV一区二区三区浪潮| 欧美日韩国产精品自在自线| 久久午夜夜伦鲁鲁片无码免费|